“Three weeks of zero limp mode, PTO, or shutdown issues. We made a huge difference in the storm relief — and earned a huge payday.”
Drove 18 hours into hurricane-stricken Florida with three bucket trucks for emergency power restoration. One truck went into shutdown within days; the other two went into limp mode within a week with PTO failures during sustained bucket operation. Without these trucks operating, the storm-relief contract — and the payday — was at risk.
Called ECM Performance at 4:30 PM. Technician drove four hours overnight and arrived before sunrise. Coordinating with off-site team, all three trucks were running perfectly by 2 PM the next day. Three weeks of zero limp-mode, PTO, or shutdown events followed. Storm restoration completed; full payday earned.